Below grade · Orem, Utah

Read the ground
before you cut it.

wntr contracts L.L.C. works earth the way a surveyor reads a cross-section: locate first, cut second, verify always. From 508 S 750 E we cover 113 scopes across three zones — excavation & demolition, paving & flatwork, and erection & specialty site work.

113
Work scopes
3
Zones
84097
Home ZIP
GRADE EL. 0'-0" TOPSOIL · FILL CLAY · SILT SAND & GRAVEL BEDROCK · SHALE BORE D-60 LOCATED UTIL 0'-10'-20'-25' WNTR CUT · 3 ZONES · 113 SCOPES
113
Scopes staked D-01 – D-113
3 zones
Earth & wreck · Flatwork · Erection
Locate 1st
Utilities marked before any ground breaks
The zones

Three zones on the cut sheet.

Every scope gets staked to its zone — earth and wrecking work through the cut, paving and flatwork on the pad, and erection & specialty on the line. Read the full cut sheet for all one-hundred-thirteen.